Stadiums | Event Centers

Marietta College | Don Drumm Stadium

Marietta, Ohio

The stadium's new clubhouse cast stone facade was exhibiting masonry cracking and mortar joint distress. RRJ was retained by the College to investigate the cause of the masonry cracks and develop repairs by rebuilding the corners with integrated expansion joints, as well as cutting in new expansion joints where needed in the field of the end walls.

Rutgers University | High Point Solutions Stadium

New Brunswick, New Jersey

The birthplace of college football, Rutgers Stadium was investigated to determine causes of premature deterioration and nonperformance of construction materials and structural steel components several years after construction completion.  A comprehensive field survey, contract document review, material sampling and testing, and a earthquake and soils investigation were conducted. Repair designs were developed of some of the components requiring repair and constructed over a multi-year construction program.

University of Maryland | Xfinity Arena

College Park, Maryland

Evaluation of the structural design defects of the cantilevered beams at the concourse level of this 1,500-seat multipurpose arena.